MES software, short for Manufacturing Execution System, records and makes use of what actually happens in production. This function models your site in units, workshops, lines, steps and equipment, captures shop floor data automatically, then calculates indicators from configurable formulas. KPI, throughput rates, yields and trends are all read in one place, with the same definition from one workshop to the next.

The ISA-95 standard places this layer between the process and the business: it turns what happens on the shop floor into information the organisation can use.

Why no two workshops ever calculate the same indicator

Ask for the OEE of two different lines and you will get two figures built in two different ways. One excludes planned stoppages, the other counts them at half weight. One works from opening time, the other from required time. Each has its reasons, and each will defend its method in the meeting.

The problem is not the figure, it is that it compares to nothing. Not to the workshop next door, not to the same workshop six months earlier, not to another site in the group. Every investment or prioritisation decision then rests on data that does not add up.

A single data model settles this before it becomes a question. The site is modelled once, the formulas are defined once, and the same indicator means the same thing everywhere.

How it works

Three real-world situations solved by this feature

Ingénieur configurant des systèmes industriels depuis un ordinateur entre des panneaux de câblage électrique

Production is run on manual readings

The situation: Today’s figures arrive tomorrow, typed up at the end of a shift into a spreadsheet that goes round by email. Nobody really disputes them, but nobody would defend them in front of an auditor either.

With the PILOT solution:

  • Automatic capture from PLCs and SCADA
  • Scheduled extractions that do not depend on anyone being available
  • A full audit trail of any correction made afterwards

The benefit: The figure becomes defensible, and the time spent producing it disappears.

Every workshop has its own definition of KPI

The situation: Calculation methods differ from one line to the next, often for good historical reasons. Comparisons become impossible, and performance meetings turn into arguments about method.

With the PILOT solution:

  • A single site data model, shared by every function
  • Formulas defined once and applied everywhere
  • Units and unit families handled consistently

The benefit: The meeting is about the results, not about how they were worked out.

Professionnel travaillant sur ordinateur portable
Opérateurs échangeant en consultant les données de production affichées sur un système MES

You only see the drift in the monthly report

The situation: A yield sliding slowly does not show up day to day. It appears in the monthly figures, when the month is already gone and all that is left is to explain it.

With the PILOT solution:

  • Trend monitoring over time, by equipment or by line
  • Continuous comparison of actual against budget
  • Indicators available without waiting for month end

The benefit: The drift gets dealt with while it can still be corrected.

Tell us about your site

Describe your plant, your lines and the systems you have in place. One of our engineers will call you back within two working days to work out the right scope.

MES software functions

Site data model

  • Units, workshops, lines, steps and equipment
  • Families and types at every level of the model
  • Products, families, grades, formats and qualities

Data capture

  • Declared sources and configurable source types
  • Scheduled extractions, run automatically
  • SCADA and PLC data picked up directly

Indicators

  • Configurable formulas, with constants and units
  • KPI, throughput rate and yield calculation
  • Indicator types suited to each level of the site

Monitoring and reliability

  • Trend curves over the period you choose
  • Actual compared against budget
  • A month’s data corrected with a full audit trail

MES, ERP, SCADA: who does what

System  Role Time frame The question it answers
ERP Orders, stock, purchasing, invoicing Day to month What have we sold, and what do we need to produce?
MES Production achieved, OEE, downtime, quality Minute to day What actually happened in production?
SCADA Equipment control and status Second What is the machine doing right now?

The three do not replace each other, they stack. An ERP without an MES plans on figures typed in by hand. A SCADA without an MES controls the plant properly but keeps nothing usable once the day is over. The MES is the layer that makes the other two add up.

How to choose MES software

Four criteria matter more than the length of the feature list.

  • Connecting to what you already have. The ability to hook into PLCs and existing equipment drives the real cost of the project, far more than the licence price.
  • How much your teams can do themselves. Software where every new report means a change request stays expensive for ten years. Being able to build your own outputs changes the economics.
  • A consistent data model. Without a shared model across workshops and sites, indicators cannot be compared, and the MES only ever produces isolated figures.
  • The ability to work on site. An MES project means cabling, connecting and commissioning. A vendor who subcontracts that adds a party to the project and a grey area of responsibility.

Where this function delivers the most

Multi-line sites

Comparisons between workshops are impossible while each one calculates in its own way.

Sites under output pressure

Losses are expensive, and their causes stay poorly documented from one shift to the next.

Multi-site operations

Group management needs consolidated indicators, which means a shared model across plants.

Ageing but sound plant

The production line works, the data capture layer is missing. This is the most common case, and the most rewarding to address.

Factories, process plants and production sites of every size: what matters is the structure of the plant and the way it is measured, not the industry.

Case studies

One software package, several functions

Our PILOT software also covers truck flows, site access, weighing, the laboratory, downtime, reporting and integration with your business systems, all on a shared site data model.

You only turn on what you need, and you extend when the need arises, without changing tools or rebuilding interfaces.

The other functions

Production tracking shares its data model with the other functions. Each one runs independently, on the same foundation.

Site access control

Identifying vehicles and people, permissions and a full record of movements.

Weighbridge software

Weight captured straight from the weighbridge, with reliable transactions.

Truck flow

Managing vehicle movements on site, from arrival to exit.

Laboratory and quality

Sampling, methods, test plans and a full history of quality results.

Downtime and causes

Stoppages detected from signals and classified against a reference set.

Industrial reporting

Reports, dashboards and designers your own teams can use.

ERP Integration

Data flowing between the shop floor and your business systems.

Your questions answered

What is MES software?2026-08-31T15:52:43+02:00

An MES, or Manufacturing Execution System, records and makes use of what actually happens in production: quantities produced, downtime, throughput rates, performance indicators. It sits between machine control and the business system.

What is the difference between an MES and an ERP?2026-08-31T15:53:16+02:00

The ERP runs the business: orders, stock, purchasing, invoicing. The MES tracks execution in production. The MES feeds shop floor data to the ERP, without which the ERP plans on figures typed in by hand.

How does IBITEK’s software calculate OEE?2026-08-31T15:54:03+02:00

OEE is produced by a configurable formula applied to a single site data model. The same definition holds for every workshop, which is what makes the values comparable across lines and across plants.

Where does the production data come from?2026-08-31T15:54:53+02:00

Sources are declared and then extracted on a scheduler: PLCs, SCADA, existing databases or manual entry. Data capture becomes regular and auditable, instead of depending on an end-of-shift reading.

Can an incorrect figure be corrected?2026-08-31T15:55:33+02:00

Yes. A month’s data can be corrected with a full audit trail. History is not quietly rewritten, which keeps previously published indicators auditable.

Is IBITEK an MES vendor or a systems integrator?2026-08-31T15:56:17+02:00

Both. IBITEK develops its own software and carries out the installation: electrical and automation engineering, equipment connection, testing and commissioning. That combination is rare in this market, where vendors subcontract the field work.